BIO MASS BOILERS
Installation of a Bio Mass Boiler and Related Systems
Project Scope:
DKJ was responsible for the installation of a wood-burning Bio Mass Boiler, along with the associated conveyor systems, pipework, and valving. The project required precise installation to ensure the system's efficient operation.
Location:
Waitoa, Matamata-Piako
Type of Industry:
Dairy